Metal Core Drilling
Inspection following repairs
10
Inspection following repairs
In all cases:
Mains-powered machines:
Machine with magnet:
Restart lock present:
C-SC_CSSM
Visual inspection
Speed check
Check coolant function
Perform drilling test in metal
Electrical safety test
Check magnetic holding force
Check restart lock
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
01.04.2019
Page 75 of 75