A.2 Installation and maintenance schedule
A.2
Installation and maintenance schedule
SICHARGE AC22 checklist
The following table shows the tasks and their expected duration for the following
applications:
• Installation/assembly
• Commissioning
• Maintenance
Table A- 1
Installation and maintenance schedule
Action
Drilling holes in the foundation anchor
Setting anchor rods
Setting up and bolting the charging station
Assembling and connecting the connection cable
Visual and functional check for mechanical damage
•
Locking mechanism
•
Cover interlock
•
Type 2 connector
•
LED topper
•
Glass front
•
Display
•
Housing
Checking of
•
Fault message
•
Backend connection
•
SIM card
Cleaning (without filter), inside and outside
Checking charging sockets and charging cables
•
Type 2 connector lock
•
Hinged cover interlock
•
Schuko socket
2
•
Charging cable and plug for damage
Check circuit breakers and the fault message on the LED topper (flashing
code)
Measurements acc. to DIN VDE, e.g.:
•
Insulation measurement
•
Grounding resistance measurement
•
Loop impedance measurement
98
1
1
Installa-
Commis-
tion/asse
sioning
mbly
x
x
x
x
x
x
x
SICHARGE Operating Instructions MID
Operating Instructions, 07/2020, A5E48573001-AB
Mainte-
Duration
nance
in min.
10
5
15
20
x
5
x
5
x
10
x
2
x
2
x
25