SICHARGE AC22 checklist
The following table shows the tasks and their expected duration for the following
applications:
• Installation/assembly
• Commissioning
• Maintenance
Table A- 1
Installation and maintenance schedule
Action
Drilling holes in the foundation anchor
Setting anchor rods
Setting up and bolting the charging station
Assembling and connecting the connection cable
Visual and functional check for mechanical damage
Locking mechanism
Cover interlock
Type 2 connector
LED topper
Glass front
Display
Housing
Checking of
Fault message
Backend connection
SIM card
Cleaning (without filter), inside and outside
Checking charging sockets and charging cables
Type 2 connector lock
Hinged cover interlock
Schuko socket
2
Charging cable and plug for damage
Check circuit breakers and the fault message on the LED topper (flashing
code)
Measurements acc. to DIN VDE, e.g.:
Insulation measurement
Grounding resistance measurement
Loop impedance measurement
98
1
1
Installa-
Commis-
tion/asse
sioning
mbly
x
x
x
x
x
x
x
SICHARGE Operating Instructions MID
Operating Instructions, 07/2020, A5E48573001-AB
Mainte-
Duration
nance
in min.
10
5
15
20
x
5
x
5
x
10
x
2
x
2
x
25