A.3 Installation and maintenance schedule
Foam rubber profile EPDM black 4 m
Retrofit kit, insulation mat SICHARGE
Ethernet interface conversion kit
A.3

Installation and maintenance schedule

SICHARGE AC22 checklist
The following table shows the tasks and their expected duration for the following
applications:
• Installation/assembly
• Commissioning
• Maintenance
Table A-1  Installation and maintenance schedule
Action
Drilling holes in the foundation anchor
Setting anchor rods
Setting up and bolting the charging station
Assembling and connecting the connection cable
Visual and functional check for mechanical damage
Locking mechanism
Cover interlock
Type 2 connector
LED topper
Glass front
Display
Housing
Checking of
Fault message
Backend connection
SIM card
Cleaning (without filter), inside and outside
Checking charging sockets and charging cables
Type 2 connector lock
Hinged cover interlock
2
Schuko socket
Charging cable and plug for damage
Check circuit breakers and the fault message on the LED topper (flashing
code)
1
 = Only for the option with a fixed charging cable
2
 = Only for the option with an additional SCHUKO socket
96
Spare part
1
1
Article number
FZI:40094.071
FZI:40094.073
FIZ:40094.104
Installa­
Commis­
tion/asse­
sioning
mbly
x
x
x
x
x
x
SICHARGE Operating Instructions MID
Operating Instructions, 02/2023, A5E48573001-AF
Weight in kg
0.65
0.1
0.3
Mainten­
Duration
ance
in min.
10
5
15
20
x
5
x
5
x
10
x
2
x
2