8.3
Diagnostic tests
Meter check
Before starting work, disconnect the charging station from the power supply using the load
breaker switch.
Secure the charging station against being switched on again.
Only personnel authorized by the operator may work on the meter during testing.
Non-compliance will void the manufacturer's warranty and invalidate the approvals.
Remove the meter
Only personnel authorized by Siemens may perform work on the meter.
Non-compliance will void the manufacturer's warranty and invalidate the approvals.
8.4
Software updates
Software updates
Siemens makes software updates available as part of ongoing feature enhancements and
improvements. Check the software version of your system (Page 63) regularly. Keep the
software version of your system up-to-date with software updates.
See also
Commissioning (Page 44)
SICHARGE Operating Instructions MID
Operating Instructions, 07/2020, A5E48573001-AB
WARNING
Maintenance and service
8.3 Diagnostic tests
89