Appendix
A.2 Installation and maintenance schedule
Spare part
Charging cable with Mode3 charging
coupling
Bracket for type 2 charging coupling
M25 CLICK cable gland
Building junction box, empty (HAK) RAL
9006
Foam rubber profile EPDM black 4 m
Retrofit kit, insulation mat SICHARGE
= Follow the relevant measurement and calibration regulations when replacing spare parts
1
A.2
Installation and maintenance schedule
SICHARGE AC22 Checklist
The following table shows the tasks and their expected duration for the following
applications:
• Installation/assembly
• Commissioning
• Maintenance
Table A- 1
Installation and maintenance schedule
Action
Drilling holes in the foundation anchor
Setting anchor rods
Setting up and bolting the charging station
Assembling and connecting the connection cable
Visual and functional check for mechanical damage
•
Locking mechanism
•
Lid lock
•
Type 2 connector
•
LED topper
•
Glass front
•
Display
•
Housing
106
Article number
FZI:40094.060
FZI:40094.061
FZI:40094.062
FZI:40094.063
FZI:40094.071
FZI:40094.073
tion/asse
Weight in kg
4.4
0.1
0.03
20
0.65
0.1
Installa-
Commis-
Mainte-
sioning
mbly
x
x
x
x
x
SICHARGE Operating instructions, ERK
Operating Instructions, 07/2020, A5E48571690-AB
Calibration law-
relevant
1
Duration
nance
in min.
10
5
15
20
x
5