Diagnostic Tests - Siemens SICHARGE Operating Instructions Manual

Table of Contents

Advertisement

Maintenance and service

8.3 Diagnostic tests

8.3
Diagnostic tests
Seals break
Before opening the seal, disconnect the charging station from the power supply using the
switch disconnector.
Secure the charging station against being switched on again.
Only personnel authorized by the operator may break seals of the infeed cover and charging
module covers during testing.
Only personnel authorized by Siemens may:
• Break seals of the meter
• Break seals of the SD card
• Perform work on the meter
Remove the meter
For removing the meter, follow these steps:
94
WARNING
SICHARGE Operating instructions, ERK
Operating Instructions, 02/2023, A5E48571690-AE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sicharge cc ac22Sicharge cc ac22 erk

Table of Contents