3. Shipping metal fixtures on the Y-axis
(1) Install Shipping (C) in the orientation shown in the figure onto the floor with the two hexagon
socket bolts.
(2) Install the two hexagon socket bolts to the positions shown in the figure.
n
After removing Shipping (C), do not reinstall the four hexagon socket bolts that had been securing
Shipping (C) to the original positions. Doing so would cause the Y-axis operation problem.
4-12
Shipping (A)
M4 x 8
M4 x 8
Shipping (C)
CSM-200