Figure 3-45 Positions to be checked for foreign matter
(1) Switches
(4) Output wiring copper
bars
Issue 05 (2019-12-24)
1. In the scenarios where holes are drilled for routing cables or covers are removed for routing cables,
after routing cables and checking cable connections, use sealing putty to fill in the gap between the
cables and the cabinet.
2. After verifying the installation, reinstall all the covers.
3. Do not remove the dustproof cover before power-on to prevent dust inside the UPS.
Copyright © Huawei Technologies Co., Ltd.
(2) Mains input wiring copper
bars
(5) Bypass input wiring
copper bars
3 Installation
(3) Battery input wiring
copper bars
(6) Cabinet rear