Huawei UPS5000-A-400 kVA User Manual page 53

Hide thumbs Also See for UPS5000-A-400 kVA:
Table of Contents

Advertisement

UPS5000-A-400 kVA
User Manual (60 kVA, PF=0.9)
Step 3 Use a pallet truck to move the cabinet to the installation position.
Step 4 Secure the cabinet to the expansion bolt holes on the floor using M12x60 expansion bolts.
Figure 3-6 Tightening expansion bolts
Step 5 Install the front, rear, left, and right anchor baffle plates.
Figure 3-7 Installing the front, rear, left, and right anchor baffle plates
----End
Issue 05 (2019-12-24)
Copyright © Huawei Technologies Co., Ltd.
3 Installation
45

Advertisement

Table of Contents
loading

Table of Contents