Download Print this page

OLT 8x12 Santa Rosa Assembly Manual page 17

Hide thumbs Also See for 8x12 Santa Rosa:

Advertisement

32.
Locate both Rear Gable Wall pieces. Rear Gables have shingles that overhang the top and
bottom of the gable frame. Screw together with 3 - 2 1/2" screws.
33.
From the outside, slide in a Rear Gable Wall
Filler Shingle to cover gable seam. Nail down
above the exposure line with 2 - 1 1/2" shingle nails.
Toll Free 1-888-658-1658
30.
Attach Wall Trim/Supports to wall with
3 - 2 1/2" screws per side. Try to conceal
screws if possible.
31.
At the doorway of your shed there will be a small gap
between the deck boards and floor plywood. Fill this gap
with the Doorway Floor Transition Strip (3/4" x 1" x 32" -
angle edge cut) and attach with 4 - 1 1/2" finishing nails.
See Step 64 for
explanation of
exposure line.
www.outdoorlivingtoday.com
Page 17
34.
Complete by attaching the short 7 1/2"
top Filler Shingle with 2 - 1 1/2" shingle nails.
sales@outdoorlivingtoday.com

Advertisement

loading