Orion
Revision 3.1
21 May 2020
Installation and First Time Power Up
Unloading
WARNING
Figure 1 - 1
Tower Pivot Point
Figure 1 - 2
Tower to Base Bolts
(1 of 4 shown)
Machine can be easily unloaded and transported by a forklift with a minimum capacity of
2500 lbs.
Use caution when uprighting the tower. Injury could occur.
1. If your model is a high tower, it may have the tower pivoted downward.
2. Use a secured strap to pivot the tower upright, securely hold the tower upright. Bolt
the tower to the base using the four provided 10mm bolts. Make sure not to pinch any
electrical connectors.
Machine Manual
Sentry HP/ LP Flex Stretchwrapper
Introduction and Safety
Page 1-11