Installation And First Time Power Up; Unloading; Tower Pivot Point; Tower To Base Bolts (1 Of 4 Shown) - Pro Mach Orion SENTRY System Manual

Table of Contents

Advertisement

Orion
Revision 2.8
27 August 2014

Installation and First Time Power Up

Unloading

WARNING
Figure 1 - 1

Tower Pivot Point

Figure 1 - 2
Tower to Base Bolts
(1 of 4 shown)
Machine can be easily unloaded and transported by a forklift with a minimum capacity of
2500 lbs.
Use caution when uprighting the tower. Injury could occur.
1. If your model is a high tower, it may have the tower pivoted downward.
2. Use a secured strap to pivot the tower upright, securely hold the tower upright. Bolt
the tower to the base using the four provided 10mm bolts. Make sure not to pinch any
electrical connectors.
Semi-Automatic Stretch Wrapping Machine
Introduction and Safety
Sentry by Orion
Page 1-9

Advertisement

Table of Contents
loading

Table of Contents