Cisco ONS 15454 Series Procedure Manual page 162

Dwdm
Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Required Tools and Equipment (ETSI)
Step 4
Line up the first Y-cable module that you want to install with the desired slot, pull the latch at the bottom
of the Y-cable module to enable the Y-cable module to slide onto the guides, and slide the module down
until it is fully installed in the slot.
Y-cable module tray.
Figure 1-31
Tab
Step 5
Repeat Steps 1 through
Step 6
Return to your originating procedure (NTP).
NTP-G15 Install the Common Control Cards
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly
Warning
touch the backplane with your hand or any metal tool, or you could shock yourself. Statement 94
Cisco ONS 15454 DWDM Procedure Guide, Release 9.2
1-74
Figure 1-31
Y-Cable Module
4
as necessary for each Y-cable module you want to install.
This procedure describes how to install the common control cards.
Redundant TCC2/TCC2P/TCC3 cards on Cisco ONS 15454 shelf
(required)
AIC-I card (optional)
MS-ISC-100T (optional; for multishelf node configurations)
NTP-G7 Install the Power and Ground, page 1-33
NTP-G14 Install DWDM Equipment, page 1-66
Required
Onsite
Provisioning or higher
Chapter 1
Install the Cisco ONS 15454 Shelf Assembly
shows the Y-cable module that can be installed in the
78-19286-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ons 15454Ons 15454 m2Ons 15454 m6

Table of Contents