Synchronización Of Units - Ingeteam Ingecon Sun Power Series Installation Manual

Table of Contents

Advertisement

Ingeteam Power Technology, S.A.
To access these terminals the protective polycarbonate sheet must be removed.
After working on the terminals the polycarbonate guard must be put back into place.
AC feed
M8 copper terminal strip
Wire gauge as per DIN 46234:
12 Nm torque
DC feed
Plate with two M12 copper orifices
Wire gauge on each pole:
64 Nm torque
5.5. Synchronización of units
When several Ingecon
Sun Power TL units are connected to the same medium voltage transformer, they must be
®
synchronized.
Care must be taken to ensure the equipment is not live when accessing its interior.
The configuration of PV array voltages should be the same.
MPPTs connected by TL inverters to the same transformer should have the same voltage settings.
To synchronize Ingecon
®
capable of synchronizing up to 6 units.
In the following example, 4 Ingecon
24
A
Units with a transformer
1 95 mm
cable
2
2 70 mm
cables on each side
2
4 240 mm
cables
2
Sun Power TL units, a synchronization signal generator kit (AAS0133) must be added,
Sun 100 TL units are synchronized:
®
A
Units without a transformer (TL)
Plate with one M10 copper orifice
Wire gauge on each pole:
2 240 mm
cables
2
47 Nm torque
Installation manual
AAS2000IKI01

Hide quick links: