2-1. Preparing for Test Run

U-36PZ3E5, U-50PZ3E5, U-60PZ3E5, U-71PZ3E5
Check Before Test Run
2 2
Power supply cable
Connection cable between indoor
and outdoor unit
Earth wire
Refrigerant pipe
Never switch the power supply ON until the installation has completed.
Supply electrical current through all indoor units and check the voltage.
Supply electrical current through all the outdoor units and check each inter-phase voltage.
Before the test run, ensure to check that the 2/3-way valve is open. Operating while the valve is closed causes the compressor to fail.
Is the wire set up and connected as described in the instructions? Check for any phase sequence.
Are the wire connection's screws loose?
Is the open and close device / leakage breaker installed?
Is the power supply cable's thickness and length appropriately measured as described in the instructions?
Is it earthed (grounded)?
Check that the insulation resistant value is more than 1M .
Use the 500 V mega-testers to measure the insulation.
Do not use the mega-tester for any other circuit except for voltage of 220-230-240V~ .
Are the wire connections for the indoor/outdoor units connected as described in the instructions? Are
there any looped wires?
Is the piping installed as described in the instructions?
Are the pipes sizes appropriate?
Does the pipe's length adhere to the specifi cations?
Is the branch pipe slant being appropriately done as described in the instructions?
Was vacuum removal suffi ciently carried out?
Was the leak tightness test carried out with nitrogen gas? Use the testing pressure of 4.15 MPa.
Is the piping insulation material appropriately installed? (Insulation material is necessary for both gas
and liquid piping.)
Is the 2/3-way valve for the liquid side and gas side open?