Installing The Chiller Duct; Filling And Starting The Chiller - Christie CineLife+ RGB PLF CP4450-RGB Installation And Setup Manual

Hide thumbs Also See for CineLife+ RGB PLF CP4450-RGB:
Table of Contents

Advertisement

A
Projector coolant inlet port
B
Projector coolant outlet port
For detailed information on connecting the coolant lines and hose accessories, refer to the
Christie Chiller Setup Kit Instruction Sheet (P/N: 020-103145-XX).

Installing the chiller duct

Installing a chiller duct and exhaust conduit allows warm air generated by chiller to be removed from
the projection room.
1. Attach the duct over the exhaust fan on the top of the chiller unit.
The duct is available in the Christie chiller setup kit (P/N: 163-127101-XX).
For detailed information on connecting the chiller duct, refer to the Christie Chiller Setup Kit
Instruction Sheet P/N: 020-103145-XX.
2. If required, a reducer duct is also provided in the kit and can be installed over the base duct to
accommodate smaller diameter exhaust conduits.
3. Once installed, connect the duct into the exhaust conduit to vent the heated air outside of the
projection room.

Filling and starting the chiller

Ensure the coolant lines are connected to the projector and all connections are tightened.
1. Open the chiller reservoir fill cap.
CineLife+ RGB PLF Installation and Setup Guide–CP4450-RGB
020-103072-02 Rev. 1 (09-2019)
Copyright
2019 Christie Digital Systems USA, Inc. All rights reserved.
©
Installing and setting up
36

Advertisement

Table of Contents
loading

Table of Contents