A qualified electrician is required to connect the chiller unit to AC power. For detailed information, refer
to the documentation provided by the chiller manufacturer. For electrical rating information, refer to
the license label on the chiller.
Related information
Connecting to power (on page 20)
Connecting to an uninterruptible power supply (on page 24)
Connecting the chiller power cable (on page 32)

Power specifications

Learn the power requirements for the projector.
Item
Voltage range
Maximum current
Line frequency

Preparing the installation site

Ensure the installation area is ready for the components.
1. Clear the installation area.
2. Post laser hazard warning signs at all entry doors.
3. Place each component near its installation location.

Lifting and positioning the projector

Safely lift and position the projector in the location where it will be used.
Warning! If not avoided, the following could result in death or serious injury.
Lift equipment must be used to position the product.
Do not install or operate the projector in any position that does not meet the stated product
specifications for alignment and orientation.
This product must be installed in a landscape orientation, with all four feet supported on a level
surface. Do not install or operate the projector in an inverted position. If your site has any installation
requirements other than a typical theater projection booth, contact Christie for assistance.
Before lifting and positioning the projector, refer to the light intensity hazard distances.
1. Using appropriately rated lift equipment, lift up the projector and move it to the location where
it will be used.
CineLife+ RGB PLF Installation and Setup Guide–CP4450-RGB
020-103072-02 Rev. 1 (09-2019)
Copyright
2019 Christie Digital Systems USA, Inc. All rights reserved.
©
Main Input A
Main Input B
200 - 240 VAC
single phase
16 A
50-60 Hz
Installing and setting up
UPS Input
200 - 240 VAC
single phase
10 A
50-60 Hz