Pre-Start Inspection - JLG E300AJ Operation And Safety Manual

Hide thumbs Also See for E300AJ:
Table of Contents

Advertisement

Pre-Start Inspection

The Pre-Start Inspection should include each of the following:
1.
Cleanliness – Check all surfaces for leakage (oil, fuel, or bat-
tery fluid) or foreign objects. Report any leakage to the
proper maintenance personnel.
2.
Structure - Inspect the machine structure for dents, dam-
age, weld or parent metal cracks or other discrepancies.
Parent Metal Crack
3.
Decals and Placards – Check all for cleanliness and legibil-
ity. Make sure none of the decals and placards are missing.
Make sure all illegible decals and placards are cleaned or
replaced.
4.
Operation and Safety Manuals – Make sure a copy of the
Operation and Safety Manual, AEM Safety Manual (ANSI
markets only), and ANSI Manual of Responsibilities (ANSI
markets only) is enclosed in the weather resistant storage
container.
5.
Walk-Around Inspection – Perform as instructed.
31215000
SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
Weld Crack
6.
Battery – Charge as required.
7.
Hydraulic Oil – Check the hydraulic oil level. Ensure hydrau-
lic oil is added as required.
8.
Accessories/Attachments - Refer to the Accessories section
in this manual or accessory installed upon the machine for
specific inspection, operation, and maintenance instruc-
tions.
9.
Function Check – Once the Walk-Around Inspection is com-
plete, perform a functional check of all systems in an area
free of overhead and ground level obstructions. Refer to Sec-
tion 4 for more specific operating instructions.
10.
Platform Gate – Keep gate and surrounding area clean and
unobstructed. Verify the gate closes properly and is not bent
or damaged. Keep gate closed at all times except when
entering/exiting the platform and loading/unloading mate-
rials.
11.
Lanyard Attach Points – During operation, occupants in the
platform must wear a full body harness with a lanyard
attached to an authorized lanyard anchorage point. Attach
only one (1) lanyard per lanyard anchorage point.
IF THE MACHINE DOES NOT OPERATE PROPERLY, TURN OFF THE MACHINE IMMEDI-
ATELY! REPORT THE PROBLEM TO THE PROPER MAINTENANCE PERSONNEL. DO NOT
OPERATE THE MACHINE UNTIL IT IS DECLARED SAFE FOR OPERATION.
2-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E300ajp

Table of Contents