Preparation And Inspection; Operation - JLG E300AJ Operation And Safety Manual

Hide thumbs Also See for E300AJ:
Table of Contents

Advertisement

Preparation and Inspection

• Ensure racks are secured to the platform rails.
• Replace torn or frayed tie-down straps.

Operation

1.
To prepare racks for loading, remove locking pins, rotate
each rack 90 degrees from stowed to working position, then
secure with locking pins.
2.
Loosen and remove tie-down straps. Place material on racks
with weight evenly distributed between both racks.
3.
Route the tie-down straps at each end across loaded mate-
rial and tighten.
4.
To remove material, loosen and remove tie-down straps,
then carefully remove material from racks.
NOTE:
Reinstall tie-down straps across any remaining material before
continuing machine operations.
31215000
SECTION 6 - ACCESSORIES
6-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E300ajp

Table of Contents