Menu - Measurement Result; Menu - Test Sequences; Menu - Empty File - ILLKO REVEXmax S User Manual

Table of Contents

Advertisement

REVEXmax - User's Manual
6.2.4

Menu - Measurement result

In this menu it is possible to set the result of measurement operation: Failed /
Passed / N/A (not performed).
The default setting for the visual inspection, functional test and mea-
suring results is PASSED.
6.3

Menu - Test sequences

In this menu you can view a list of available measurement test sequences which can
be assigned to the currently selected appliance.
Assigning the test sequences from the list of the currently selected appliance is done
as follows:
Press the [menu] key.
Select the Test sequences item and press the [ent] key for confirmation.
Select required test sequence.
Press the [ent] key to check each individual step in the test sequence.
Press the [Load] key to assign the test sequence to DUT.
The list of test sequences cannot be modified in REVEXmax – it is
transferred from the PC software.
6.4
Menu - Empty file
In this menu the temporary memory is erased, i.e.:
the ID number is empty
all measured values are deleted
the results of the visual inspection, functional test and measurement operation
are set to PASSED
the test sequence is deactivated
c 2019 ILLKO, s.r.o.
www.illko.cz
6 Instrument main menu
Page 43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Revexmax w

Table of Contents