Alpha ESS Storion-SMILE-B3 Installation & Operation Manual page 33

Energy storage system
Table of Contents

Advertisement

`
Note: please pay attention to the CTs direction.
In AC system the both two meter addresses should be set, please refer to 2.4.5.5.2.
2.4.5.4 Mixed Installtion of CT and Meter
A CT and a three-phase meter (ADL3000, ALD3000 with CT, ACR10R with CT) can be installed in the
same system, the CT and the meter shall be installed according to the corresponding position, otherwise
the system will run abnormally.
The initial setup is CT connection. If a meter is connected, after connecting, a relevant configuration
work shall be carried out by the installer on AlphaCloud, please refer to 5.1.2.
NOTE: This function is released in SMILE-B3 EMS firmware version V1.00.33 or above.
In AC system and the mixed installation of CT and meter situation, the meter address should be
also set in the meter, please refer to 2.4.5.5.1 (ADL3000) and 2.4.5.5.2 (ACR10R).
2.4.5.5 Meter setting
2.4.5.5.1 ADL3000
Step 1: The initial interface of the meter
(normal working interface) is as shown
below:
Step 3: Click the "Enter" button to enter the
following interface, and press the up and
down arrow keys to enter the password
0001;
Step 5: Click the "Enter" button again to enter
the address interface:
___________________________________________________________________
Installation
Step 2: Click the "SET" button to enter the
password interface:
Step 4: Click the "Enter" button and the
password input is completed.
Step 6: Click the "Enter" button to enter the
following interface, press the up and down arrow
keys to set the meter address, the Grid meter
(DC, AC and Hybrid system) address is set to
001, and the PV meter (AC and Hybrid system)
address is set to 002.
Alpha ESS Co., Ltd.
Your Smart Energy
Page 31 of 46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents