Alpha ESS Storion-SMILE-B3 Installation & Operation Manual page 25

Energy storage system
Table of Contents

Advertisement

`
Your Smart Energy
Installation
Step 9: Please drill holes directly on the wall at the marking positions of the brackets. Insert the
expansion tube and pass the expansion screw through the gasket and lock with a screwdriver.
NOTE: If the drill is not long enough, you can mark the hole positions before drilling.
Step 10: Remove the maintenance cover before wiring.
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 23 of 46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents