`
Your Smart Energy
Installation
Step 11: Pass the red positive power cable through the two BAT+ waterproof rings. And fix it on the
copper bars inside the battery and inverter.
Step 12: pass the black negative power cable through the two BAT+ waterproof rings. And fix it on the
copper bars inside the battery and inverter.
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 24 of 46