Alpha ESS Storion-SMILE-B3 Installation & Operation Manual page 27

Energy storage system
Table of Contents

Advertisement

`
Your Smart Energy
Installation
Step 13: Pass the communication cable through the COM waterproof ring of BAT and BMS waterproof
ring of INV. And insert it into the corresponding port (anyone of the two RJ45 port).
DIP Switch of B3
63A DC Breaker
63A DC Breaker
DIP Switch of M4856-P
Step 14: If there is only one M4856-P to be connected, switch off the DIP2 in SMILE-B3 and switch on
the DIP2 in M4856-P.
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 25 of 46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents