Christie recommends fully securing the pump module before starting to reroute and connect
the hoses.
To avoid damage when re-routing the hoses, ensure care is taken to not kink the hoses.
4K40-RGB Series Service Guide–D4K40-RGB, Roadie 4K40-RGB, Mirage 4K40-RGB
020-102960-02 Rev. 1 (12-2019)
Copyright
2019 Christie Digital Systems USA, Inc. All rights reserved.
©
Ventilation and cooling
54