PROFINET
To create a project offline, you need the PROFINET address, the device type and the device
version, e.g. firmware version 4.5 or higher.
What?
1
Create a new project
Commissioning Manual
Commissioning Manual, (IH1), 01/2013, 6SL3097-4AF00-0BP3
1. Call the menu "Project > New ...".
The following default settings are displayed:
User projects: Projects already in the target directory
Name: Project_1 (can be freely selected)
Type: Project
Storage location (path): Default (can be set as required)
2. If necessary, correct "Name" and "Storage location".
2.3 Creating a project in the STARTER commissioning tool
How?
Commissioning
Comment
The project is created
offline and loaded to the
target system when
configuration is complete.