Chassis Bolt And Nut - Suzuki DL1000 Service Manual

Hide thumbs Also See for DL1000:
Table of Contents

Advertisement

CHASSIS BOLT AND NUT

Tighten initially at 1 000 km (600 miles, 1 month) and
every 6 000 km (4 000 miles, 6 months) thereafter.
Check that all chassis bolts and nuts are tightened to their specified torque. (Refer to page 2-28 for the loca-
tions of the following nuts and bolts on the motorcycle.)
1 Steering stem head nut
2 Steering stem locknut
3 Front fork upper clamp bolt
4 Front fork lower clamp bolt
5 Front axle
6 Front axle pinch bolt
7 Handlebar holder bolt
8 Handlebar holder set nut
9 Front brake master cylinder mounting bolt
0 Front brake caliper mounting bolt
A Brake hose union bolt
B Clutch master cylinder mounting bolt
C Clutch hose union bolt
D Air bleeder valve
E Brake disc bolt (Front & Rear)
F Rear brake caliper mounting bolt
G Rear brake master cylinder mounting bolt
H Rear brake master cylinder rod locknut
I Front footrest bracket mounting bolt
J Swingarm pivot nut
K Swingarm pivot shaft locknut
L Rear shock absorber mounting nut
(Upper & Lower)
M Cusion lever mounting nut
N Cusion lever rod mounting nut
O Rear axle nut
P Seat rail bolt
ITEM
PERIODIC MAINTENANCE
N·m
kgf-m
90
9.0
80
8.0
23
2.3
23
2.3
100
10.0
23
2.3
23
2.3
45
4.5
10
1.0
39
3.9
23
2.3
10
1.0
23
2.3
7.5
0.75
23
2.3
23
2.3
10
1.0
18
1.8
26
2.6
100
10.0
90
9.0
50
5.0
78
7.8
78
7.8
100
10.0
55
5.5
2-27
lb-ft
65.0
58.0
16.5
16.5
72.5
16.5
16.5
32.5
7.0
28.0
16.5
7.0
16.5
5.5
16.5
16.5
7.0
13.0
19.0
72.5
65.0
36.0
56.5
56.5
72.5
40.0

Advertisement

Table of Contents
loading

Table of Contents