Chassis Bolt And Nut - Suzuki AN650 2002 Service Manual

Table of Contents

Advertisement

2-28
PERIODIC MAINTENANCE

CHASSIS BOLT AND NUT

Tighten initially at 1 000 km (600 miles, 1 month) and
every 6 000 km (4 000 miles, 6 months) thereafter.
Check that all chassis bolts and nuts are tightened to their specified torque. (Refer to page 2-28 for the loca-
tions of the following nuts and bolts on the motorcycle.)
1 Steering stem head nut
2 Front fork upper clamp bolt
3 Front fork lower clamp bolt
4 Front axle
5 Front axle pinch bolt
6 Handlebar clamp bolt
7 Front brake master cylinder mounting bolt
8 Front brake caliper mounting bolt
9 Brake hose union bolt
0 Air bleeder valve
A Brake disc bolt (Front & Rear)
B Rear brake caliper mounting bolt
C Rear brake master cylinder mounting bolt
D Front footrest bracket mounting bolt
E Swingarm pivot nut
F Rear shock absorber mounting nut
(Upper & Lower)
G Rear axle nut
ITEM
N·m
65
23
23
65
23
23
10
26
23
7.5
23
26
10
(M8)
26
(M6)
11
100
29
100
kgf-m
lb-ft
6.5
47.0
2.3
16.5
2.3
16.5
6.5
47.0
2.3
16.5
2.3
16.5
1.0
7.0
2.6
19.0
2.3
16.5
0.75
5.5
2.3
16.5
2.6
19.0
1.0
7.0
2.6
19.0
1.1
8.0
10.0
72.5
2.9
21.0
10.0
72.5

Advertisement

Table of Contents
loading

This manual is also suitable for:

An650l 2002E-24 2002An650k3 2002

Table of Contents