Optics Installation - Dell EMC PowerSwitch Z9332F-ON Installation Manual

Hide thumbs Also See for PowerSwitch Z9332F-ON:
Table of Contents

Advertisement

12. Tighten the front thumbscrew on each rail.
To remove the switch, loosen the thumbscrews, lift the rail latch, and slide the switch forward. After the switch is almost removed, slide
the white-plastic lever towards the thumbscrews to unlock and remove the switch.

Optics installation

The Z9332F-ON switch has QSFP56-DD and SFP+ optical ports.
For a list of supported optics, see the specification sheets at
CAUTION:
Switches with fan airflow from the PSU to the I/O—reverse airflow—are subject to tighter restrictions for
power consumption on cables and optics that are used for 400 GbE ports. Reverse airflow switches do not support high-
power cables or optics. 400 GbE transceivers and active cables may exceed the supported threshold.
CAUTION:
Review the optics specification sheet to understand which models support airflow from the I/O to the PSU
(normal) and which support airflow from the PSU to I/O (reverse).
CAUTION:
Use caution when inserting or removing QSFP-DD optics.
CAUTION:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground
strap when handling the Z9332F-ON switch and components.
WARNING:
When working with optical fibers, follow all warning labels and always wear eye protection. Never look
directly into the end of a terminated or unterminated fiber or connector as it may cause eye damage.
1. Position the optic to enter the port correctly.
The optic has a key that prevents it from being inserted incorrectly.
2. Insert the optic into the port until it gently snaps into place.
NOTE:
When you cable the ports, be sure not to interfere with the airflow from the small vent holes above and below
the ports.
www.dell.com/support
or contact your Dell EMC Sales representative.
Z9332F-ON switch installation
19

Advertisement

Table of Contents
loading

Table of Contents