Daikin VRV III REYQ8PY1 Service Manual page 360

R-410a heat recovery 50hz
Hide thumbs Also See for VRV III REYQ8PY1:
Table of Contents

Advertisement

Si37-701
[CHECK 4] Power Transistor Check
Perform the following procedures prior to check.
(1) Power Off.
(2) Remove all the wiring connected to the PC board where power transistors are mounted on.
[Preparation]
· Tester
[Point of Measurement and Judgment Criteria]
· Measure the resistance value using a tester at each point of measurement below, 10 minutes later after power OFF.
To use analog tester:
Measurement in the resistance value mode in the range of
multiplying 1kΩ.
Point of Measurement
No.
Judgment Criteria
+
1
P2
U
2
P2
V
3
P2
W
4
U
P2
5
V
P2
15kΩ and
6
W
P2
above
7
N3
U
(including )
8
N3
V
9
N3
W
10
U
N3
11
V
N3
12
W
N3
[PC board and Circuit Diagram]
Troubleshooting
Remarks
2 ~ 15kΩ
Due to condenser charge
and so on, resistance
measurement may require
some time.
2 ~ 15kΩ
J1
J2
J3
X10A
Troubleshooting (OP: Unified ON/OFF Controller)
∗ Preparing a tester in the analog system is recommended.
A tester in the digital system with diode check function will
be usable.
To use digital tester:
Measurement is executed in the diode check mode. (
Point of Measurement
No.
+
1
P2
2
P2
3
P2
4
U
P2
5
V
P2
6
W
P2
7
N3
8
N3
9
N3
10
U
N3
11
V
N3
12
W
N3
P1
P3
P1
DM
K2
J1
L1
J2
L2
L3
J3
Judgment Criteria
Remarks
Due to condenser charge
U
and so on, resistance
1.2V and over
V
measurement may require
some time.
W
0.3 ~ 0.7V
U
V
W
Due to condenser charge
and so on, resistance
1.2V and over
measurement may require
some time.
U V
W
N3
P2
P3
IGBT
N3
U
V
W
X11A
)
(V2895)
349

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents