Step 2 Remove the UPS outer packing.
Step 3 Remove the bolts that secure the UPS to the pallet and remove the UPS from the pallet.
Figure 3-2 Removing the pallet from the UPS
----End

3.2 Installing a Single UPS

When you install the UPS and connect cables, do not step on the front door baffle plate and
the door support at the bottom of the cabinet to prevent paint flake-off and deformation.
Otherwise, the front door will not be properly closed.

3.2.1 Installing a UPS Cabinet

3.2.1.1 Installing the UPS on the Ground

Determining the UPS Installation Position
Issue 02 (2020-01-10)
Ensure that the installation floor is flat.
The marking-off template is delivered with the UPS.