Preparing Power Cables - Huawei UPS5000-S-880 kVA User Manual

Table of Contents

Advertisement

UPS5000-S-880 kVA
User Manual (CMI)

3.1.3 Preparing Power Cables

The current values in the table correspond to the 380 V system.
Table 3-2 Recommended cross-sectional areas for power cables
Item
Mains input
Bypass input
Output
Battery input
Issue 02 (2020-01-10)
Table 3-1 lists only the common tools for installation and cable connection. For more dedicated tools
required, see the document for each component. Prepare tools based on site requirements.
The UPS can generate large leakage currents. A circuit breaker equipped with a residual
current device (RCD) is not recommended.
If multiple UPSs are connected in parallel, input and output power cables for each UPS
should have the same length and specifications.
The TN-C system is supported. If it is used, the input N and PE need to be short-circuited.
Mains input current (A)
Recommended cross-
2
sectional area (mm
)
Bypass input current (A)
Recommended cross-
2
sectional area (mm
)
Output current (A)
Recommended cross-
2
sectional area (mm
)
Nominal battery discharge current (A)
Copyright © Huawei Technologies Co., Ltd.
880 kVA
1625
L1
4 x (4 x 240)
L2
L3
N
PE
240
1338
L1
4 x (4 x 240)
L2
L3
N
PE
240
1338
U
4 x (4 x 240)
V
W
N
PE
240
1755
3 Installation
46

Advertisement

Table of Contents
loading

Table of Contents