Huawei UPS5000-S-880 kVA User Manual page 59

Table of Contents

Advertisement

UPS5000-S-880 kVA
User Manual (CMI)
Knock the expansion bolt into the hole until the expansion tube completely fits into the hole.
The expansion sleeve must be completely buried under the ground to facilitate subsequent
installation.
Figure 3-5 Installing an expansion bolt (unit: mm)
1.
2.
3.
4.
----End
Combining Power Cabinets and Bypass Cabinets
The power cabinets and bypass cabinets are separately packed for delivery. Before installing
the UPS, combine the power cabinets and bypass cabinets. Before combining the cabinets,
ensure that the required fittings are complete.
Issue 02 (2020-01-10)
Drill a hole into the concrete floor using a hammer drill. The hole depth ranges from 52
mm to 60 mm.
Slightly tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a hammer until the expansion sleeve is fully inserted into the hole.
Partially tighten the expansion bolts.
Remove the bolt, spring washer, and flat washer.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
51

Advertisement

Table of Contents
loading

Table of Contents