Connecting Other Signal Cables
Connect signal cables for each UPS.

3.4 Verifying the Installation

Table 3-7
Issue 02 (2020-01-10)
BSC master and slave cables are required in a dual-bus parallel system.
shows the cable connections for a dual-bus system containing two master systems.
Figure 3-45 Connecting signal cables to a dual-bus system
lists check items.