Install The Gauge Wheels; Gauge Wheel Mounting Locations; Mount The Gauge Wheels - Raven AutoBoom Installation Manual

For bestway
Hide thumbs Also See for AutoBoom:
Table of Contents

Advertisement

Chapter 3

Install the Gauge Wheels

Gauge Wheel Mounting Locations

Wheel mounting locations may be influenced by the boom configuration. Determine the appropriate location for
mounting the wheels on the boom, ensuring the wheels will not interfere with or be damaged while folding or
unfolding the booms. The wheels should be mounted outside of the boom fold, but inside of the boom
breakaway.

Mount the Gauge Wheels

Note:
The appearance of the wheel axles may vary.
Gauge Wheel Installed
FIGURE 13.
Remove the lug nuts from the right wheel axle (P/N 063-0131-585).
1.
Place the wheel (P/N 322-0131-008) on the wheel axle.
2.
Align and place the hub retainer bracket (P/N 107-0171-617) over the wheel.
3.
Reinstall the lug nuts on the wheel axle to secure the wheel and hub retainer bracket.
4.
Mount the receiver bracket (P/N 116-0159-536) to the front of the right boom using four 3/8"-16 x 4-1/2" zinc
5.
hex bolts (P/N 311-0054-118) and four 3/8"-16 zinc flanged lock nuts (P/N 312-1001-164).
Insert the wheel axle into the receiver bracket, positioning it so that the bottom of the wheel touches the
6.
ground (or nearly so) and the wheel faces away from the machine.
Secure the gauge wheel assembly in the wheel mounting bracket by installing two 1/2"-13 x 1-1/2" SS hex
7.
bolts (P/N 311-0058-186) and two 1/2"-13 zinc hex nuts (P/N 312-1001-043).
Repeat the steps above to install the left wheel.
8.
20
WARNING
The machine must remain stationary and
switched off, with the booms unfolded and
supported, during installation or maintenance.
Bestway 2009 & Newer AutoBoom Installation Manual

Advertisement

Table of Contents
loading

Table of Contents