Installation and setup

Learn how to install, connect, and optimize the projector display.

Site requirements

To safely install and operate the Mirage 4K40-RGB projectors, the installation location must meet
these minimum requirements.
Physical operating environment
Ambient temperature (operating) 5°C to 40°C (41°F to 104°F)
Humidity (non-condensing) 10% to 80%
Operating altitude 0 to 3000 meters (0 to 9843 feet)
External exhaust ducting
Sufficient ventilation is required around the projector to regulate the temperature of the internal laser
module. If necessary, air intake and exhaust HVAC ducts can be installed.
An exhaust duct is also available for purchase as an optional accessory (P/N: 163-102104-XX).
Instructions for installing the exhaust duct are included with the accessory part.
The installation site must provide an airflow 450 cubic feet per minute (CFM) at 1 to 1000 meters
elevation, and must accommodate a heat load of 4 kW.
For each additional 1000 meters above sea level, increase the airflow (CFM) value by 15%. If an
extraction duct is not used, the operating temperature range is restricted to 5°C to 25°C at a maximum
altitude of 3000 meters.
Power connection
A 30 A maximum rated, certified wall circuit breaker is required. It must be part of the building and
easily accessible. Connect to AC power using the power cord provided with the projector.
Mirage 4K40-RGB Installation and Setup Guide
020-103014-03 Rev. 1 (08-2019)
Copyright
2019 Christie Digital Systems USA, Inc. All rights reserved.
©
16

Advertisement

Table of Contents
loading

Table of Contents