8. Critical Installation Checklist
The following is a list of critical requirements that must be adhered to in order to ensure
reliable operation of your VERT-X operator(s):
•
Ensure that the Wall Bracket is securely anchored
•
Make sure that the operator's maximum stroke is being utilised
•
Only use V-Series cable for the installation
•
Leave a 350mm long loop in the cable close to the operator. See Figure 17
•
Fit an electric gate lock if the gate leaf width is greater than 2.5 metres
•
Ensure that the opening and closing angles conform to the installation guidelines
•
Ensure that your gate and operator(s) are equipped to deal with Wind Loading
(refer to the Table 4 on page 14 )
Never run the operator directly from the battery! Doing so will cause
damage to the operator and invalidate the warranty. Only run the
operator from the V-Series Controller.
www.CentSys.com
page 27
Need help?
Do you have a question about the VERT-X and is the answer not in the manual?
Questions and answers