Critical Installation Checklist - CENTURION SYSTEMS VERT-X Mechanical Installation Manual

Hide thumbs Also See for VERT-X:
Table of Contents

Advertisement

8. Critical Installation Checklist

The following is a list of critical requirements that must be adhered to in order to ensure
reliable operation of your VERT-X operator(s):
Ensure that the Wall Bracket is securely anchored
Make sure that the operator's maximum stroke is being utilised
Only use V-Series cable for the installation
Leave a 350mm long loop in the cable close to the operator. See Figure 17
Fit an electric gate lock if the gate leaf width is greater than 2.5 metres
Ensure that the opening and closing angles conform to the installation guidelines
Ensure that your gate and operator(s) are equipped to deal with Wind Loading
(refer to the Table 4 on page 14 )
Never run the operator directly from the battery! Doing so will cause
damage to the operator and invalidate the warranty. Only run the
operator from the V-Series Controller.
www.CentSys.com
page 27

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VERT-X and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents