To enable monitoring for the test, click Monitoring Tests, then click the name of the test. Then,
click the Enable button.
Enabling a test
13.3.2 Monitoring results
After monitoring is enabled, the test measurement uses the designated reference trace and any
change notifications about trace events will be sent automatically.
You can view monitoring results and statuses by clicking Monitoring Tests.
Test results table
RTU-4000/RTU-4100 User Manual, D07-00-132P-RevA01
Page 34 of 44