Ametek Amrel PLA Series Operation Manual page 154

Programmable dc electronic load
Table of Contents

Advertisement

*Recommended tools: adjustable ranch x 2pcs
Install INLET TOP interconnect pipe to female threaded pipe at PLW rear panel.
Install INLET BOTTOM interconnect pipe to female threaded pipe at PLW rear panel. Using
one ranch fixed position on the female threaded pipe at PLW rear panel, and the other ranch
torque carefully at the interconnect pipe, Tighten the male end connection into the mating
female end connection until hand-tight approximately 2 threads. Then tighten the male end
connection until wrench-tight approximately 2 threads.
When installing the inlet and outlet pipes, be careful not to over-torque the male pipe fittings
into the Inlet/Outlet pipe terminals. This additional force may crack the inlet and/or outlet
female piping on the eLoad.
Locate the FLUID INLET distribution pipe. Install onto the interconnect pipes.
Using one ranch fixed position on the interconnect pipes, and the other ranch torque carefully
at the distribution pipe.
M470039-01 REV-F
Page 153

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents