•
Disconnect the protective earth connector
•
Open both strain reliefs for the connecting cable
(patch cable) ZME <-> LRE
•
Connecting cable ZME <-> LRE is released.
•
Pull the housing sidewards to pass the crank axis and
remove it.
2018112-069 Rev. F
eBike II, eBike II L, eBike II EL
- 99 -