Dms Exchange - GE eBike II Series Service Manual

Table of Contents

Advertisement

dMs
exCHange
Remove the DMS cable from the LRE board
Loose 2 Allen key screws
The strain gauge unit hangs at the tensioning rope
Scratch the sealing wax from the top suspension of
the tensioning rope (e.g. by use of a screw driver)
Remove the tensioning rope to the top by pulling it off
the vertical slot
The assembly of the replacement DMS unit is performed in
reverse order.
WARNING:
The rubber coated side of the strain
gauge should not be hurt !!
To fix the tensioning rope in the upper fixture, a standard
glue can be used.
2018112-069 Rev. F
eBike II, eBike II L, eBike II EL
- 45 -

Advertisement

Table of Contents
loading

Table of Contents