Powering Up The V100 - H3C SecPath V100-E Installation Manual

Table of Contents

Advertisement

Figure 4-4 Define port parameters
Powering Up the V100-E
Checking before power-up
Check the following issues before powering up the V100-E:
Both the power cord and the PGND cable are correctly connected.
The voltage of the power supply matches the requirements.
The console cable is correctly connected. The console terminal (or PC) has been started and the
associated parameters have been set on it.
Before powering on the V100-E, locate the power switch so that you can disconnect the power supply in
time in case of an emergency.
Powering up the V100-E
Turn on the site power.
Turn on the power switch of the V100-E.
Checking after power-up
After the V100-E is powered up, please check:
4-3

Advertisement

Chapters

Table of Contents
loading

Table of Contents