Figure 13. Two-post flush-mount installation
2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger
bracket to the post flange with two user-supplied screws, item 3.
4
Repeat this procedure for the second rail.
S5200F-ON Series switch Installation
23
Need help?
Do you have a question about the S5200F-ON Series and is the answer not in the manual?