Completing The Installation - Extron electronics MediaLink MLM-WB+ User Manual

Wall box mounting option
Table of Contents

Advertisement

im Vertrieb von
Installation, cont'd

Completing the Installation

Once you have pretested the installation and made any adjustments necessary, you
can secure all equipment in the MLM-WB+.
1.
2.
Securing cables to the cable guide
3.
4.
5.
CAUTION
www.camboard.de
2-16
MLM-WB+ • Installation
CAMBOARD Electronics
Secure the equipment in the 4U rack enclosure by completely tightening the
clamps or rack mounting screws.
Using cable ties, secure all power and A/V cables to the cable guide behind
the 4U rack enclosure. This will provide strain relief as you open and close
the door.
pt op
La
D VD
D VD
R
Y
VC
PLA
DIS
R
PO
WE
LUM
LUM
E
E
VO
VO
/
MAX
MIN
Replace the left and right side panels. Hand tighten the nuts that hold each
side panel in place.
Do not over-tighten the nuts.
Completely tighten the mounting screws for the faceplates or rack shelves in
the 2U rack enclosure.
Close and lock the door.
To avoid damaging the equipment in the 4U rack enclosure, always remove
CDs, DVDs, or tapes before closing the door.
Tel. 07131 911201
Fax 07131 911203
ce-info@camboard.de

Advertisement

Table of Contents
loading

Table of Contents