Ul Requirements; Components, Hardware, And Required Tools; Main Mlm-Wb+ Components - Extron electronics MediaLink MLM-WB+ User Manual

Wall box mounting option
Table of Contents

Advertisement

im Vertrieb von

UL Requirements

Components, Hardware, and Required Tools

Main MLM-WB+ components

www.camboard.de
CAMBOARD Electronics
The Underwriters Laboratories (UL) requirements listed below pertain to the
installation of an MLM-WB+ wall box.
Power supplies used with devices such as the MLC must be secured in the
1.
MLM-WB+ with the flat side down.
2.
You must use a UL listed junction box.
The UL listed electrical wall box (junction box) is included with the
MLM-WB+.
3.
This unit must be installed in accordance with the National Electrical Code
and with all local codes.
The illustrations in this section identify the components of the MLM-WB+ and the
mounting hardware provided with it. Also included is a list of tools required to
perform the installation. The installation steps in this chapter make reference to
these components, hardware, and tools.
Tel. 07131 911201
Fax 07131 911203
ce-info@camboard.de
MLM-WB+ • Installation
2-3

Advertisement

Table of Contents
loading

Table of Contents