Job Aid: Replacing the Avaya S8500 dual network interface
Powering down the server
After the backup is finished, complete the following steps to power down the S8500/B/C server.
1. From the server Web interface click Shutdown This Server; select Delayed.
2. After the server shuts down unplug the power cord from the back of the server.
3. Label and disconnect the Ethernet cable from the chassis.
4. Label and disconnect the power cord from the SAMP.
5. Label and disconnect the USB modem cable from the RS-232 port on the SAMP.
6. Label and disconnect the LAN connection (if used) from the Ethernet port on the SAMP.
7. Label and disconnect the cable(s) from the Ethernet port on the dual NIC (if used).
Removing the cover of the server
!
CAUTION:
Remove all power from the server before starting this procedure.
CAUTION:
To remove the cover of the server:
1. Remove the cover of the server. The cover of each S8500 server is slightly different:
S8500C: push the latch button on the top left front of the server as shown in
l
Use a screwdriver to slide the cover back enough to lift it off the chassis.
142 Job Aids for Field Replacements (FRUs) for the Avaya S8500 Server