Avaya S8500 Series Job Aids For Field Replacements page 15

Hide thumbs Also See for S8500 Series:
Table of Contents

Advertisement

Tasks for replacing an S8500/B/C server (continued)
Task
7
Install the replacement
server into the rack
8
Note: Skip this step if
reusing the original hard
drive.
Insert the software CD in
the CD-ROM drive of the
server, if using the blank
hard drive
9
Reconnect attached
devices
10
Power up the server
11
Note: Skip this step if using
a new hard drive.
Test the hard drive by
logging onto the
Maintenance Web
Interface.
Description
S8500: see
Installing the replacement S8500
l
server in the rack
S8500B: see
Installing the replacement S8500B
l
server in the rack
S8500C:
Installing the replacement S8500C
l
server in the rack
Open the CD-ROM drawer and place the
Communication Manager CD in the drawer and close
it.
The software CD contains boot software that the
server automatically accesses when you power up the
server.
Reconnect the LAN connections to the Ethernet ports
on the RSA/SAMP and dual NIC (if used).
Reconnect all attached devices, including the laptop,
both modems, and the external flashcard reader (if
used).
Plug the power cords into the server and RSA. Press
the power-control button on the front of the server.
Note: Wait at least 3 minutes for the server to
complete its power up. Watch the power-on LED on
the server.
Connect a crossover cable to the services port on the
back of the server. Open a browser on your laptop.
Type 192.11.13.6 and press Enter to log onto the
Maintenance Web Interface as craft or dadmin. Log in
as craft or dadmin.
Under Server, click Status Summary and note the
information concerning the hard drive.
03-300529 Issue 4 January 2008
Replacing the S8500/B/C server
on page 32.
on page 51.
on page 68.
3 of 3
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8500bS8500c

Table of Contents