Job Aid: Replacing the Avaya S8500/B/C server
Installing the replacement S8500C server in the rack
To install the replacement S8500C server back in its rack:
1. Install the server onto the slide rails in the rack.
2. Locate the marked cable that you removed from the NIC and plug it into the NIC.
3. Connect the USB modem cable to the SAMP.
4. Connect the LAN connection (if used) to the Ethernet port on the SAMP.
5. Connect the power cord to the SAMP.
6. Connect the power cord to the back of the server.
7. Push back into place.
See Quick Start for Hardware Installation: Avaya S8500 server for more information on
installing the S8500C server in the rack and reconnecting all the cables.
Powering up the S8500C server
To power up the S8500C server:
1. Plug the power cord into the power receptacle on the rear of the server.
2. If necessary press the Power button located on the front right-hand side.
3. Log into the server.
4. Check to ensure the original Ethernet configuration settings by selecting Server
Configuration > Configure Server from the Maintenance Web Interface.
Checking network activity on the S8500C server
To check for network activity:
1. After the server is back in service, check the LEDs for network activity on:
Services and/or customer network (Notes 2 and 9 in
l
Dual NIC card (Notes 3 and 4 in
l
68 Job Aids for Field Replacements (FRUs) for the Avaya S8500 Server
Figure
Figure
16)
16)