Festo CPV -VI Series Manual page 118

Cpv valve terminal
Hide thumbs Also See for CPV -VI Series:
Table of Contents

Advertisement

5. Maintenance and conversion
5−18
Place the right−hand end plate to be fitted on the CPV
·
valve terminal and insert the tie rods.
Place the CPV valve terminal on the right−hand end plate.
·
Make sure that the tie rods, which are not yet screwed
tight, do not fall out of the CPV valve terminal.
Remove the left−hand end plate from the CPV valve ter
·
minal.
Place the left−hand end plate to be fitted on the CPV valve
·
terminal. Swing the CPV valve terminal onto the left−hand
end plate.
Screw in the tie rods and tighten them to the same
·
amount with 0.3 Nm.
Tighten first the centre and then the outer tie rods with
·
2 + 0.2 Nm (CPV10/14) or 4 Nm (CPV18).
Fit the appropriate sub−base on CPV valve terminals with
·
CP, AS−Interface, DI or MP connection (see the section
Fitting components in valve locations").
Fit the CPV valve terminals onto the fastening surface
·
(see sections Fitting onto a wall," Hat rail clamping
unit" or Fitting on the floor" in the chapter Fitting").
Then fit the pneumatic and electrical connections
·
(see chapter Installation").
Festo P.BE−CPV−EN en 0503g

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents