Step 28. Prepare The Pna For The User; N5242 - Keysight Technologies N524 A Series Installation Note

2-port/4-port , pna-x upgrade kit
Table of Contents

Advertisement

Description of this Upgrade

Step 28. Prepare the PNA for the User

Step 28. Prepare the PNA for the User
1. If necessary, reinstall front jumper cables.
2. Install the cable guards, pushing them over the front jumper cables until
3. Install the dust caps on the test ports.
4. Install labels included in kit as required (e.g., KCC, two person Caution).
5. Clean the analyzer, as needed, using a damp cloth.
Installation Note N5242-90023
the cushioning material touches the front panel of the PNA.
55

Advertisement

Table of Contents
loading

Table of Contents